Multimedia Gallery /

Report

Report

  • Final Verification Study Report on As-Constructed Conditions of the North Approach Tunnels, South Approach Tunnels and Hung Hom Stabling Sidings

  • Final Report on Holistic Assessment Strategy for the Hung Hom Station Extension

  • Holistic Proposal for the Verification and Assurance of Hung Hom Station Extension

  • Report on the construction of the internal and parapet walls at To Kwa Wan Station

  • Report on steel bar fixing works for the platform slab at Hung Hom Station extension